A plant engineer writing an asset tag for a cooling-water pump while holding a tablet with the pump's work order open.

CEDX Assets · Operations

The register prices
what wears out.

320 assets, 117 of them A-class critical, each with a health score and a 12-week trend. 206 open work orders at $356K of labor and parts. 180 PM schedules at 73.3% compliance — and a failure-risk board carrying $9.01M that says exactly why.

One forklift's meter reads 4,820 of 5,000 hours — 96% of threshold, battery degraded, $12K on the alert. The register raised it before the shift did.

assets.cedxsystems.com — live build
CEDX Assets overview: assets, open work orders, PM overdue, risk exposure, uptime and PM-compliance cards, a fleet-health ring, root-caused alerts and the down-or-degraded list.

Runs on demo data. Plant East is the software's demo site, August 2026.

320 assets · 117 A-class114 down or degraded today
206 open work orders$356K labor + parts · 72 overdue
PM compliance 73.3%48 overdue · backlog priced $423K

What it is

Three registers the plant runs on.

320 assets with a health trend, not a snapshot

Code, name, category, site, criticality, status, health and trend on every row — 197 assets are declining on the 12-week trend and the filter counts them. Open work orders and PM overdue sit on the same row as the score.

  • Health score with trend arrow per row
  • Declining-197 filter on the bar
  • Criticality A, B, C next to status
asset-mgmt — screen-2
320 assets with a health trend, not a snapshot

206 open work orders, craft and all

Preventive, Inspection, Emergency, Corrective and Project types across Controls, HVAC, Elec, Mech, Fleet and Facilities crafts. 89 are critical or emergency in the priority queue; the overdue-days column tops out at 39.

  • Overdue-days column — worst at 39
  • Priority from Low to Critical
  • $356K open across labor and parts
asset-mgmt — screen-3
206 open work orders, craft and all

180 PM schedules, 48 overdue

Frequencies run daily, weekly, monthly, quarterly, annual and meter-based. The quarterly filter-and-belt on AHU-12 is 86 days late; the annual boiler inspection on BOIL-E1 is 34 days late with 12 labor hours attached.

  • Meter-based PMs alongside calendar ones
  • Overdue days and labor hours per PM
  • Overdue-only chip for the Monday list
asset-mgmt — screen-4
180 PM schedules, 48 overdue

Product tour

Four screens, captured from the running build.

Not a mockup and not a concept deck. This is what opens at /app/asset-mgmt.

assets.cedxsystems.com
CEDX Assets Overview screen.CEDX Assets Asset register screen.CEDX Assets Work orders screen.CEDX Assets PM schedules screen.

01 — Overview

The fleet brief, with the risk priced

Assets 320, open work orders 206, PM overdue 48, risk exposure $9.01M, uptime 99% as a labelled 30-day proxy, PM compliance 73.3%. The alerts name the asset: CNV-04 degraded with 3 open work orders and 14.2 downtime hours in 30 days.

  • Fleet health ring at 99, four inputs shown
  • Assets by status: 177 online to 9 retired
  • Backlog alert: 42+ PMs overdue at $423K

02 — Asset register

The list everything else reads

320 assets across utilities, production, HVAC, vehicles, safety and more, on sites from HQ to the two plants. The roof tank at DC-W is declining; the east lift is down with 2 open work orders and a PM overdue.

  • 320 rows · 117 A-class critical
  • Health trend over 12 weeks per asset
  • Sites: HQ, DC-E, DC-W, FLD, PLT-E, PLT-W

03 — Work orders

The maintenance queue, costed

320 work orders with asset, type, status, priority, craft, due and overdue days. The preventive job on PUMP-353 is critical and 39 days out; emergency rows sit On hold with the craft named.

  • 206 open · 72 past due
  • 89 critical or emergency
  • Craft assigned on every row

04 — PM schedules

The prevention library, overdue days included

180 schedules with task, frequency, criticality, next due, overdue days, labor hours and site. The quarterly heater-and-profile on the reflow unit is 64 days late and A-class — the gap the downtime alert prices.

  • 180 schedules · 48 overdue
  • Labor hours per PM — 0.7 to 12 in view
  • Compliance at 73.3%, on the card

Who runs it

Three roles keep the fleet running.

Roles, not references. We have no named customers yet, so nobody in these photographs is quoted, credited or claimed as one.

Field maintenance tech

Works the queue from the van: 206 open work orders, 89 critical or emergency, craft assigned before arrival.

critical/emerg · 89

Reliability engineering

Reads the failure-risk board: CNV-04 degraded with 3 open work orders, 23 days of PM overdue and 14.2 downtime hours in 30 — $249K of exposure with a name on it.

risk exposure · $9.01M

Facilities and compliance

The annual boiler inspection is 34 days overdue and priced at $119K; the PM library is 180 schedules deep and the overdue-only chip makes the Monday list.

PM overdue · 48

The shape of it

What the demo register actually looks like.

Every figure below is legible in the captures above. Nothing here is a projection of your fleet — it is the state of the demo data.

320assets on the register117 A-class · 114 down/degraded
206open work orders$356K labor + parts
73.3%PM compliance48 overdue of 180
$9.01Mrisk exposurethe failure-$ board
Root-caused alerts, priced on screensymptom → cause → fix · demo register
  • 42+ PMs overdue — backlog cost climbing, deferred risk on A-class$423K
  • CNV-04 failure risk elevated — degraded, 3 open WOs, 14.2h downtime in 30d$249K
  • BOIL-E1 annual inspection 34 days overdue — A-class utility$119K
  • SMT-RF3 down — zone-3 heater, 28h open downtime, emergency WO$62K
  • FLT-12 meter at 96% of threshold — 4,820 of 5,000h, degraded battery$12K
Assets by status177 online of 320
  • Online · 177
  • Degraded or down · 114
  • Offline or retired · 29
PM compliance73.3% on-time across 180 schedules
73.3%
  • On-time · 73.3%
  • Overdue · 48 schedules, $423K backlog

How it runs

An asset's life, in the order it actually happens.

01

Register

Every asset lands with code, category, site and criticality — 320 in, 117 A-class, health trending from day one.

02

Meter

Runtime accumulates against thresholds: one forklift at 4,820 of 5,000 hours, 96%, with the battery already degraded.

03

Work

A work order opens with type, priority and craft — 206 open, $356K in labor and parts, 72 past due.

04

Prevent

The PM library fires by calendar or meter. The 48 overdue schedules are the gap, and the backlog alert prices it at $423K.

One record

The asset is the same record
the floor already argues about.

A station on the plant schedule, a forklift in the aisle, a boiler on the compliance calendar — one register underneath all of them.

All 132 applications

Limits

What Assets does not do yet.

Finding this out on the third call is worse for you than reading it here, and worse for us.

Start

Open it before you talk to anyone.

Pilot

Your register, your crafts

  • Everything in Try
  • Asset-import plan
  • PM-library workshop
  • Estate map
Talk to sales

Estate

Assets with the rest of it

  • Assets with Manufacturing, Warehouse and Quality
  • One identity, one bill
  • CEDX delivery
Book an estate map

Questions

Before you pilot Assets.

Is the software on this page real?

Yes. Every screenshot is a capture of the running build, and you can open the same build at /app/asset-mgmt. It runs on demo data — the demo Plant East site.

What does the health score mean?

A per-asset score with a 12-week trend arrow, computed from the register's own rows — open work orders, PM overdue and downtime. 197 assets are declining in the demo, and the filter counts them, so the score is checkable rather than taken on faith.

What is the failure-risk board?

The $9.01M figure: exposure per asset computed from the same inputs, with the worst cases named. CNV-04 tops it — degraded, 3 open work orders, 23 days of PM overdue, 14.2 downtime hours in 30 — priced at $249K on the alert.

Can PMs be meter-based?

Yes — the schedule library mixes calendar and meter frequencies, and the forklift alert is the meter kind: 4,820 of 5,000 hours, 96% of threshold, flagged before the battery failed outright.

Does it promise to cut downtime?

No. The demo shows the register surfacing what is degraded, overdue and expensive. What a crew does with that list is the work; this page does not put a percentage on it.

Is Assets audited or certified?

No certification has been issued. What we can evidence about hosting, encryption, tenant isolation and production access is on the security page.

The register is running. Go and read its risk board.

Live build, demo data, no card. Then ask which of your A-class assets is 34 days late on its annual.