A desk late at night covered in crumpled receipts, a ledger binder and a phone — the period-end mess an ERP's close-risk panel exists to replace.

CEDX ERP · Operations

The ops backbone that
shows its working.

180 orders at $2.51M open value, 60 BOMs with cost rolled up per revision, 140 work orders with the shortage flagged on the row. Then the two boards most systems hide: 90 MRP exceptions priced at $356K, and a close-risk panel that caught 18 unposted journals before period P08 ended.

The Overview lists the unposted journals at $1.92M next to the work order blocking close. A system that argues with itself on screen is one you can check.

erp.cedxsystems.com — live build
CEDX ERP overview: orders, booked revenue, fill rate, work orders, MRP exceptions and close-risk cards, an ops-health ring, root-caused alerts and the largest open orders.

Runs on demo data. Northline Systems is the software's demo workspace, period 2026-P08.

180 orders · $2.51M open value105 open or held · fill rate 42% avg
60 BOMs · avg rollup $15443 buildable · avg scrap 2.4%
90 MRP exceptions · $356K impactroot-caused and priced on the board

What it is

Three lists every ops team keeps — kept as one record.

180 orders, each with a status and a GL code

The order book is a table, not a summary: order, customer, status, lines, amount, fill %, due and GL code on every row. SO-22100 sits Held at $92K with fill at 3%; the fulfilled rows say 100. Open value across the 105 open and held orders is $2.51M.

  • Fill % and GL code on every row
  • Status chips: Open, Partial, Fulfilled, Held, Draft
  • CSV of the view you were actually looking at
erp — screen-2
180 orders, each with a status and a GL code

60 BOMs with the cost already rolled up

Every parent carries its component count, rollup cost, scrap %, revision and lead time. CTL-4400 — the edge controller the whole demo estate runs on — rolls up at $420 across 14 components at revision R7, and the scrap column flags the pro sensor assembly at 4.6%.

  • Rollup, scrap % and lead days per row
  • Revisions tracked — R3 through R7 in view
  • Active, Draft and Obsolete as filters
erp — screen-3
60 BOMs with the cost already rolled up

140 work orders, 31 flagged short before you ask

The SHORT column answers the question a planner actually asks: WO-441, building CTL-4400, is Held at 35% progress with Short = Yes, and the shortage-only filter isolates all 31 blocked rows. 72 orders are open on the plant at $364K of cost.

  • Shortage-only filter — 31 blocked rows
  • Progress % next to status, not in a report
  • On-time proxy of 25%, labelled a proxy on screen
erp — screen-4
140 work orders, 31 flagged short before you ask

Product tour

Four screens, captured from the running build.

Not a mockup and not a concept deck. This is what opens at /app/erp.

erp.cedxsystems.com
CEDX ERP Overview screen.CEDX ERP Orders screen.CEDX ERP BOMs screen.CEDX ERP Work orders screen.

01 — Overview

The ops brief, root-caused and priced

Six cards — orders 180, booked $3.36M, fill rate 42%, work orders 140, MRP exceptions 90 at $356K, close risk 61 with 27 high — and an ops-health ring that reads 34 because of them. Each alert arrives symptom, cause, fix: the SNS-IR-90 shortage blocks WO-441 at $18K, with short 80 against demand 82 spelled out.

  • Ops health 34, broken into its four inputs
  • 18 unposted journals in P08, priced at $1.92M
  • Largest open orders with status on the same page

02 — Orders

The order book, not a summary of it

1–25 of 180 orders, searchable by order or customer, with the matching-view count on the bar. The columns are the conversation: amount, lines, fill %, due and GL.

  • Fill % per order, 0 to 100
  • Open value $2.51M across 105 open + held
  • Filters and saved views persist on the bar

03 — BOMs

Recipes with the cost rolled up per revision

60 BOMs in catalog, 43 buildable. The averages sit on cards above the table — $154 rollup, 2.4% scrap across active — and every row carries the same fields the averages are computed from.

  • Parent, assembly, components, rollup, scrap, rev, lead
  • Avg rollup $154 · avg scrap 2.4%, active only
  • Obsolete revisions stay one filter away

04 — Work orders

Where the shortage shows up first

140 work orders with build, name, status, qty, progress, due and the SHORT flag. WO-441 Held at 35% and WO-428 in progress at 36% both say Yes — the two rows the MRP board priced back on the Overview.

  • SHORT = Yes on the row, filterable
  • 72 open on plant at $364K of cost
  • Released, In progress, Held, Done, Draft as chips

Who runs it

Three roles live on this record.

Roles, not references. We have no named customers yet, so nobody in these photographs is quoted, credited or claimed as one.

Operations lead

Owns the Monday review from the same Overview: 90 MRP exceptions priced at $356K, close risk at 61 with 27 high, and the largest open orders on the page.

MRP exceptions · 90

Supply and capacity planner

Works the exceptions board: 31 short work orders, the excess-capital flag on the mailer SKU at $13K, and the shortage that put WO-441 on hold.

short work orders · 31

Close and controllership

The 18 unposted journals in period P08 at $1.92M and the 14-day credit hold on SO-22890 land here before the period ends, not after.

close risk · 61

The shape of it

What the demo workspace actually looks like.

Every figure below is legible in the captures above. Nothing here is a projection of your estate — it is the state of the demo data.

180orders on the book$2.51M open value · fill 42%
90MRP exceptions$356K impact, root-caused
61close-risk items27 high · 18 unposted journals
60BOMs in catalogavg rollup $154 · scrap 2.4%
Root-caused alerts, priced on screensymptom → cause → fix · demo period P08
  • 18 unposted journals in period P08 — unposted value open on GL, AR and AP modules$1.92M
  • SO-22890 credit hold, 14 days — $48.9K order frozen, no-ship flag, close risk Med$48K
  • SNS-IR-90 shortage blocks WO-441 — short 80, available 2, demand 82 for the controller build$18K
  • PKG-MAILER-M excess capital — 600 available vs 120 demand$13K
Orders by status105 open or held of 180
  • Open or held · 105 of 180
  • Fulfilled, partial or draft · 75
Fill rate across open ordersaverage across open+ — from the orders card
42%
  • Lines filling in full · 42% average
  • Held rows at 0–3% fill pull the average down

How it runs

An order's life, in the order it actually happens.

01

Order

An order lands with lines, amount, due and GL — 180 on the book, $2.51M open, fill % computed per row.

02

Build

The BOM prices the build before release — CTL-4400 at $420 across 14 components — and the work order carries progress and shortage on the row.

03

Exception

The MRP board prices the problem instead of colouring it: the SNS-IR-90 shortage blocks WO-441 at $18K, symptom, cause and fix on one line.

04

Close

Unposted journals and credit holds surface as close risk — 61 items, 27 high — before period P08 ends, not in the audit.

One record

The same SKU runs through
the whole estate.

CTL-4400 is not a demo coincidence. It is one record: a BOM here, a held work order on the floor, a quarantined lot in Quality, a bin in Warehouse.

All 132 applications

Limits

What ERP does not do yet.

Finding this out on the third call is worse for you than reading it here, and worse for us.

Start

Open it before you talk to anyone.

Try

Open it right now

  • The live build
  • Demo data
  • No card, no call
Open live ERP

Pilot

Your chart, your BOMs

  • Everything in Try
  • Data-import plan
  • Exception-board workshop
  • Estate map
Talk to sales

Estate

ERP with the rest of it

  • ERP with Manufacturing, Warehouse and Quality
  • One identity, one bill
  • CEDX delivery
Book an estate map

Questions

Before you pilot ERP.

Is the software on this page real?

Yes. Every screenshot is a capture of the running build and you can open the same build at /app/erp. It runs on demo data — Northline Systems, period 2026-P08.

Where do the alert dollar figures come from?

From the same arrays the tables show. The SNS-IR-90 alert prices itself at $18K and spells out the arithmetic — short 80, available 2, demand 82 for the controller build — as symptom, cause, fix.

What is in the close-risk number?

61 items, 27 of them high: 18 unposted journals worth $1.92M across GL, AR and AP modules, credit holds like SO-22890's 14-day freeze, and work in process stuck on held work orders.

Is the 42% fill rate a promise?

No. It is the demo workspace's average across open orders, and it is low because the demo holds orders on purpose so the boards have something to say. Yours would be computed from your rows the same way.

Does ERP replace our ledger?

The demo shows journals posting to GL, AR and AP modules, and CEDX Books is the estate’s ledger product. How the two share a chart of accounts is an estate-map conversation, not something this page claims.

Is ERP audited or certified?

No certification has been issued. What we can evidence about hosting, encryption, tenant isolation and production access is written up on the security page.

The build is running. Open the order book.

Live build, demo data, no card. Then ask whether your Monday ops review could survive the same questions.