Tasks keeps the small work — renewals, approvals, requests, follow-ups — and scores each one for deadline risk. Then it does the sum nobody else does: your 107 tasks today estimate to 60h 9m against an 8-hour day.
The quick-add reads “Renew MSA fri 90m p1 Legal” and parses the lot — day, estimate, priority, list. The point of a task tool is that capturing is cheaper than remembering.
tasks.cedxsystems.com — live build
Runs on demo data. The miss-risk percentages are the deadline model reading the seeded demo set.
220 open tasksacross 12 lists — system, shared and personal
60h 9m planned for todayagainst an 8h 0m day capacity — util 752%
63 tasks overdueabove the 4-week median, flagged for reschedule
What it is
Three things a task list usually gets away with.
A capacity check on the day itself
My day totals the estimate of everything you planned: 60h 9m of remaining work against an 8h 0m day, a utilisation of 752%, headroom zero. Most tools let you plan that day. This one prints what it costs before you promise it.
107 tasks on the day, each with its remaining estimate
Late rows marked in red, not folded into the count
Overdue in view: 63, the workspace total alongside
tasks — screen-2
Deadline risk, scored per task
Every open task carries a miss forecast. The top of the table reads TSK-1011 at 90% — 40 minutes of estimated work, due yesterday, stuck waiting — and the model's average across the workspace is 32%, with 51 tasks rated high.
Highest deadline risk: 90%, 90%, 90%, 88%, 86% …
Root-caused: “TSK-1011 miss risk 90% · Waiting”
Day health 83%, blending load, utilisation and risk
tasks — overview
A calendar that shows the overflow
The week lays estimated minutes against an 8-hour day-capacity line, per day. Planned load is 43h 13m of a 56h week, over-capacity days read zero — because the 37 overdue tasks, 23h 15m of them, sit in their own lane below, pulled into the week honestly.
80 scheduled this week · 103 unscheduled beyond it
“Drag cards to reschedule” — the line moves with you
Unscheduled, due later: 103 tasks · 62h 0m
tasks — screen-3
Product tour
Four screens, captured from the running build.
Not a mockup and not a concept deck. This is what opens at /app/tasks.
tasks.cedxsystems.com
01 — Overview
The workspace's small work, totalled
220 open tasks, 107 on your day, 14 due today, 63 overdue, 45 waiting on someone else. The alerts do the triage for you: a vendor renewal at 90% miss risk, one person at 107% day utilisation with 9 overdue, and the overdue queue sitting above its 4-week median.
Completed vs created, daily, with the freezes annotated
Tasks by status: 60 inbox · 62 todo · 71 doing · 27 waiting · 100 done
45 waiting, named as an external-dependency pile
02 — My day
The day you actually have
One list: everything planned for today, with priority, status, remaining estimate, due date, list and owner. The capacity ring next to it reads 752% — which is the point. You triage the day before the day triages you.
Mon Aug 3 to Sun Aug 9: each day's cards stack their estimated minutes against the day-capacity line, with today marked. Nothing is over the line this week — planned load 43h 13m of 56h — and the overflow lanes keep the 37 overdue and 103 unscheduled visible.
Week capacity 56h · planned 43h 13m · −22%
Over-capacity days: 0, and the number is earned
Drag a card and the day's stack recomputes
04 — Lists
Twelve lists, each with a temperature
System, shared and personal lists in one table: open count, overdue count, estimated minutes and a heat score. The Inbox is hottest at 95 with 16 open and 8 overdue; one personal list carries 25 open and 10 overdue — 935 estimated minutes of one person's queue.
Heat per list: 95, 95, 95, 95, 95, 90, 86 …
Kind column: system · shared · personal
CSV export of the view you were actually looking at
Who runs it
Three roles live off the small work.
Roles, not references. We have no named customers yet, so nobody in these photographs is quoted, credited or claimed as one.
Operations lead
Owns the shared lists — Legal, Office, Finance, Hire — and watches heat instead of chasing people: 95 on the Inbox means the intake is the bottleneck.
shared lists · 9 of 12
Support operations
Works the customer follow-ups out of the queue: waiting is a status with a count — 45 — not a place tasks go to be forgotten.
waiting · 45 external deps
Office and facilities
Access requests, vendor renewals, runbook edits: the tasks that keep a site running, each with an estimate and a due date instead of a hallway promise.
office list · 24 open
The shape of it
What the demo workspace actually looks like.
Every figure below is legible in the captures above. Nothing here is a projection of your estate — it is the state of the demo data.
320tasks in the seed window100 done · 220 open
752%day utilisation60h 9m planned on an 8h day
32%average miss risk51 tasks rated high
95hottest list heatInbox · 16 open · 8 overdue
Tasks by status320 total · the done column is the seed window's completion set
Done — the on-time completion the alerts refer to100
Doing71
Todo62
Inbox60
Waiting — the external-dependency pile27
Day health107 tasks · 60h 9m remaining · 51 high risk
83%
Health 83% — load, utilisation and miss risk blended
Day util 140% on the remaining-hours view
Average deadline riskmiss forecast across 220 open tasks
Avg miss risk 32%
51 tasks rated high — the reschedule candidates
How it runs
A task's day, in the order it actually happens.
01
Capture
Quick-add parses the sentence — “Renew MSA fri 90m p1 Legal” becomes a 90-minute P1 on the Legal list due Friday. Capturing has to be cheaper than remembering.
02
Plan
The task lands on My day or the calendar, where its minutes count against the 8-hour line. A 752% day gets rebuilt before it gets lived.
03
Work
Status moves inbox → todo → doing → done, with waiting as a first-class state — 45 tasks are parked on named external dependencies, not buried.
04
Reschedule
The miss-risk model re-scores as dates pass. Overdue tasks surface in their own lane — 63 of them — for an explicit reschedule, not a quiet reddening.
One record
Small work, same people, same dates.
A task is not a separate universe from the delivery board. The renewal, the approval and the follow-up share identity, owners and calendars with everything else the estate runs.
Finding this out on the third call is worse for you than reading it here, and worse for us.
Tasks is not generally available. What opens today is the live build on demo data — every task, owner and date in the captures is seeded, including the 752% day.
We have no named customers to show you, so this page shows none. The owners named in the list columns are demo personas.
The miss-risk score is a heuristic over due dates, estimates and status — not a commitment about what you will finish. Treat it as a triage aid, not a forecast to plan a quarter on.
Estimates are manual minutes. There is no automatic time capture in Tasks; logged time lives in Timesheets.
No audit or compliance certification has been issued for Tasks. What we can evidence about hosting, encryption and access is on the security page.
Yes. Every screenshot is a capture of the running build and you can open the same build at /app/tasks. It runs on demo data.
What does the day-capacity ring actually measure?
The sum of remaining estimates on today's tasks against your working hours. The demo day carries 60h 9m of planned work on an 8h 0m day, so the ring reads 752% — an absurd plan made visible before it is made a promise.
How is miss risk scored?
From what the task knows: due date, remaining estimate, status and age. TSK-1011 scores 90% because 40 minutes of work is due and the task is stuck waiting. The model is a triage aid — it sorts the reschedule conversation, it does not run it.
What is the heat score on a list?
A blend of open count, overdue count and estimated minutes per list. The Inbox reads 95 with 16 open and 8 overdue; the scale runs down to 60 on the calmest personal list in the demo set.
Can a task be waiting on someone without being forgotten?
That is what the waiting status is for. 45 tasks sit in it with the external dependency named, the Overview counts them as a pile, and they still carry miss risk — parking a task does not silence its deadline.
Is Tasks audited or certified?
No certification has been issued. What we can evidence about hosting, encryption, tenant isolation and production access is written up on the security page.
Your day is already planned. See what it costs.
Live build, demo data, no card. Then add the task you are currently holding in your head.