A release engineer at night holding a printed deploy checklist, a wall clock reading 3:51 AM and a pager on the desk.

CEDX Deploy · Developer & low-code

Risk-scored shipping, with a
measured rollback window.

Deploy is the estate's shipping lane: every deploy carries provenance and a risk score, every environment carries a protection tier, and the safe rollback window is measured in minutes — before you need it.

The hardest alert on the overview reads: checkout production risk 88, window 12m — an irreversible migration with no canary. A deploy tool that prints that before the fact is doing its job.

deploy.cedxsystems.com — live build
CEDX Deploy overview: deploys, success rate, mean build, high-risk, rollback-window and blocked-checks cards, ship health ring, highest-risk board and root-caused alerts.

Runs on demo data — Northline Systems is the demo workspace, not a customer.

320 deploys in the window181 ready · 56.6% steady
4m 12s mean buildbuild plus promote
9 reviews requiredagent-origin production deploys

What it is

Three things a deploy tool must make visible.

Every deploy with provenance and risk

320 deploys with service, environment, status, provenance, SHA, duration and risk. dpl_a8f2 — checkout-api to production — carries an Automation provenance, a review flag, 4m 12s and risk 88. Who or what shipped a change is a column, not a rumor.

  • Provenance chips: Human, Assistant, Automation
  • Review-required chip holds 9 production deploys
  • Risk score sortable, 91 at the top
deploy — screen-2
Every deploy with provenance and risk

Environments with protection tiers

18 environments across production, staging, preview and sandbox tiers. production requires 2 reviewers and a 10-minute wait, holds 48 variables and 12 services; training has none and has gone stale. Protection is per-environment configuration you can read.

  • 7 production-tier environments, protected
  • 9 environments with reviewers or checks
  • 5 stale ≥7 days, flagged on the row
deploy — screen-3
Environments with protection tiers

A preview host per pull request

96 preview hosts, one per PR or branch, with service, status and age. pr-951 fix/partner-auth queues for checkout-api; 49 are ready to open; 34 have sat over 72 hours with a consider-expire flag. Previews are cheap because they are counted.

  • 49 ready · 17 building · 34 stale
  • Branch and PR number on every host
  • Stale ≥72h gets an expire suggestion
deploy — screen-4
A preview host per pull request

Product tour

Four screens, captured from the running build.

Not a mockup and not a concept deck. This is what opens at /app/deploy.

deploy.cedxsystems.com
CEDX Deploy Overview screen.CEDX Deploy Deploys screen.CEDX Deploy Environments screen.CEDX Deploy Previews screen.

01 — Overview

Ship health, warts included

320 deploys at 56.6% steady, a 4m 12s mean build — and a ship health of 51%, printed without rounding up. Alerts root-cause the pressure: a payments-settle schema live with under 10 minutes of safe rollback, an edge rewrite rolled back after a failed canary, and 9 required checks failing right now.

  • 15 high-risk deploys, prod or hot staging
  • 12 rollback windows at 30 minutes or less
  • Recent production listed, newest first

02 — Deploys

The ledger of everything shipped

1–25 of 320 deploys across preview, staging and production. dpl_c1e4 — payments-settle, Assistant provenance, review flag, 6m 50s, risk 91 — sits two rows from dpl_9b30, an inventory-read promote at 02:14 that the overview flags as after-hours. Context is on the row.

  • Env on every row: production, staging, preview
  • Duration from 1m 12s to 6m 50s in view
  • Queued, building, error, canceled as chips

03 — Environments

Tiers, reviewers and wait times

production and hotfix both demand required reviewers; canary takes one reviewer and a 5-minute wait. dr-us-east demands reviewers and has gone stale — a finding in itself, on screen.

  • Variables and services counted per environment
  • Wait times: 5m on canary, 30m on dr-us-east
  • Status: healthy, active, stale

04 — Previews

Branches you can actually open

Preview hosts carry their PR, branch and service — feat/ledger-partition spans four of them across storefront-web, payments-settle and notify-pipeline. Errors surface here first: pr-731's webhook-dispatch host shows Error at 4 days old.

  • 96 hosts across the window
  • Age in days, 5d at the top of the stale list
  • Ready, building, error, canceled chips

Who runs it

Three roles keep shipping boring.

Roles, not references. We have no named customers yet, so nobody in these photographs is quoted, credited or claimed as one.

Release engineering

Owns the pipeline: the 4m 12s mean build, the 13 deploys blocked on failing checks, and the discipline that keeps 02:14 promotes rare and flagged.

320 deploys · 56.6% steady

Check owners

The required checks are their suites — 9 failing right now, each one a named gate between a branch and production.

13 blocked · 9 checks failing

Environment owners

Run the 18 tiers from training to canary: reviewers, wait times, variable counts — and the stale flags when an environment stops earning its compute.

18 environments · 7 production

The shape of it

What the demo pipeline actually looks like.

Every figure below is legible in the captures above. Nothing here is a projection of your estate — it is the state of the demo data.

320deploys in the window181 ready · 56.6% steady
4m 12smean buildbuild plus promote
15high-risk deploysscore ≥55 · prod or hot staging
12rollback windows ≤30msafe rollback, measured
Highest-risk deploysdeploy impact score
  • dpl_a8f2 · checkout-api98
  • dpl_c1e4 · payments-settle98
  • dpl_d5cd · payments-settle92
  • dpl_c2f0 · checkout-api86
  • dpl_9b30 · inventory-read74
Ship healthsuccess versus risk pressure
51%
  • Success rate · 56.6% of 320 deploys
  • Errors 40 · high risk 15 · tight windows 12
Environments with protection9 of 18 carry reviewers or checks
  • Protected · 9 environments
  • Unprotected · 9, including training and perf-lab

How it runs

A deploy's life, in the order it actually happens.

01

Build

Build and promote average 4m 12s across the window — the card on the overview, not a brochure number.

02

Check

Required checks gate every tier: 13 deploys currently blocked, 9 checks failing, each named on the row it stops.

03

Gate

Production demands 2 reviewers and a 10-minute wait; agent-origin production deploys queue for review — 9 are waiting now.

04

Roll back

The safe window is measured before it is needed: 12 deploys have 30 minutes or less, and payments-settle's is under 10. The edge rewrite used its window after a failed canary.

One record

The gate the estate
already ships through.

Deploy is not a release tool for one stack. It is the same gate for apps, functions, scripts and environments — one provenance model across all of it.

All 132 applications

Limits

What Deploy does not do yet.

Finding this out on the third call is worse for you than reading it here, and worse for us.

Start

Open it before you talk to anyone.

Pilot

Your first pipeline

  • Everything in Try
  • Environment-tier design
  • Required-check mapping
  • Rollback-window review
Talk to sales

Estate

Deploy with the rest of it

  • Deploy with Test, Sandbox and Functions
  • One identity, one bill
  • CEDX delivery
Book an estate map

Questions

Before you pilot Deploy.

Is the software on this page real?

Yes. Every screenshot is a capture of the running build and you can open the same build at /app/deploy. It runs on demo data from the Northline Systems demo workspace.

What does the risk score measure?

Deploy impact: reversibility, canary coverage, schema change and blast. The checkout-api deploy at risk 88 carries an irreversible migration with no canary — the alert says exactly that, with a 12-minute window.

How do agent-origin deploys work?

Like human ones, plus a flag. Assistant and Automation provenance show on the row, and production deploys from an agent queue for review — 9 are waiting in the demo workspace, each with approval control at the environment tier.

What is a rollback window?

The minutes in which a deploy can be safely reversed, measured per deploy: 12 sit at 30 minutes or less, and payments-settle's v4 schema has under 10. The edge gateway's failed canary used its window and rolled back — that is what the number is for.

Is Deploy audited or certified?

No certification has been issued. What we can evidence about hosting, encryption, tenant isolation and production access is written up on the security page.

The pipeline is running. Go and look at it.

Live build, demo data, no card. Then check the rollback window on the last irreversible thing you shipped.